Fig. 01 The site prior to surgery.
Fig. 02 Opened flap, large crater and perforation of buccal plate.
Fig. 03 2.0mm pilot drill is used to drill beyond the depth of the socket.
Fig. 04 The final drill used to evaluate the position and angulation of the preparation.
Fig. 05 A 4.20mm diameter 13mm length Tapered Self Thread Implant is selected.
Fig. 06 A cover screw is placed on the implant.
Fig. 07 The implant and socket covered by a resorbable membrane.
Fig. 08 Sutured flap.
Fig. 09 Surgical site after 4 months healing.
Fig. 10 Implant exposed positioning the flap buccally in order to achieve attached gingiva.
Fig. 11 The 2-piece zirconium titanium abutment
Fig. 12 The porcelain bonded to the zirconium.
Fig. 13 The porcelain bonded to the zirconium.
Fig. 14 The porcelain bonded to the zirconium.
Fig. 15 Composite closing the top of the screw of the final restoration.