Fig. 01 Pre-operative view of failing restorations on tooth Nos. 18 and 19
Fig. 02 Preliminary impression of unprepared teeth
Fig. 03 Completed preparations
Fig. 04 Protemp Plus temporization material was injected into the preliminary impression
Fig. 05 The preliminary provisional impression was re-seated in the patient’s mouth
Fig. 06 Completed provisional restorations
Fig. 07 Completed all-ceramic crowns
Fig. 08 The provisional restorations were removed and the preparations cleaned with a prophy cup
Fig. 09 Scotchbond Universal adhesive was applied to preparations, rubbed for 20 seconds and air-thinned
Fig. 10 Scotchbond Universal adhesive was applied to entire intaglio surface of restorations
Fig. 11 Scotchbond Universal adhesive was air-thinned to prevent pooling and solvents were evaporated
Fig. 12 RelyX Ultimate Adhesive Resin cement was injected into the restorations
Fig. 13 Partial polymerization was initiated for 1 to 3 seconds using curing light
Fig. 14 Residual cement was removed in a gel-state with a sickle scaler
Fig. 15 Residual cement was removed in a gel-state with floss
Fig. 16 Post-operative X-ray demonstrated excellent fit and seal of restorations