Fig. 01
The rationale for provisionalization approach; lab-processed vs. chairside fabrication.
Fig. 02
A pre-operative view of the treatment site for a fixed three-unit bridge.
Fig. 03
Silicone-based putty index (Coltene’s Affinis
®
Putty Soft).
Fig. 04
The prepped abutments ready for provisionalization.
Fig. 05
VOCO's Structur
®
3 is introduced into the putty index.
Fig. 06
VOCO's Structur
®
3 is introduced into the putty index.
Fig. 07
The patient occludes into the index.
Fig. 08
The Structur
®
3 provisional is trimmed with No. 15 scalpel blade.
Fig. 09
The provisional is trimmed with an eight-bladed finishing bur.
Fig. 10
The auto-polish feature is demonstrated on the provisional.
Fig. 11
Shade accuracy with VITA A2 shade tab and A2 Structur
®
3.
Fig. 12
The completed and cemented provisional.