Fig. 01
First molar and second premolar ready for proximal restoration.
Fig. 02
Tooth preparation.
Fig. 03
Prepared teeth.
Fig. 04
Sectional matrix and wedge in place.
Fig. 05
Separating ring in place.
Fig. 06
Placement of etching gel.
Fig. 07
Rinsing of etching gel.
Fig. 08
Bonding resin placed.
Fig. 09
Drying the bonding agent.
Fig. 10
Bulk fill composite placement.
Fig. 11
Dual cure composite in place.
Fig. 12
Five-second cure with LED light.
Fig. 13
Removal of sectional matrix.
Fig. 14
Sectional matrix and wedge in place for molar restoration.
Fig. 15
Contouring proximal contact area with spoon.
Fig. 16
Injection of bulk fill composite.
Fig. 17
Composite resin in place.
Fig. 18
Carving anatomy with carbide finishing bur.
Fig. 19
Completed restorations before rubber dam removal.
Fig. 20
Polishing point number one.
Fig. 21
Polishing point number two.
Fig. 22
Polishing brush.
Fig. 23
Contact checked with floss.
Fig. 24
Final result at two-week follow-up appointment.